It is 20 years or older
Most shingle roofs wear out around this age. Tile lasts longer, but the felt underneath often does not.
24/7 emergency roof repair across Venice & the Westside
When patches stop working, a new roof is the smart move. Our roof replacement service covers everything: tear-off, new decking where needed, the city permit and the final inspection. Homeowners across Venice, CA can get a free estimate the same day they call. Leaking badly while you plan? Our 24 hour crew can tarp it for you first.
One of these signs alone may just need a repair. Two or more usually means your roof is near the end.
Most shingle roofs wear out around this age. Tile lasts longer, but the felt underneath often does not.
If you have patched the roof in different spots year after year, the whole system is failing.
Shingles that curl at the edges or crack across the roof can no longer shed water well.
Sand-like grit in gutters means shingles are losing their protective top layer.
A dip in the roof can mean the decking or rafters have been weakened by water.
If you can see light through the roof boards, rain can get in the same way.
A new roof is a big project. We keep it simple and tell you what happens each day.
We measure the roof, check the attic and help you pick the right material, color and budget.
We apply for the City of Los Angeles re-roof permit and set your start date.
Old roofing comes off. We replace any soft or rotted decking before anything new goes on.
New underlayment, flashing and roofing are installed, then the city inspector signs off.
Venice has every style of house, so there is no single best roof. Here is a quick comparison to start the conversation.
| Material | Look | Best for | Learn more |
|---|---|---|---|
| Asphalt shingle | Clean and classic | Bungalows, budget-friendly re-roofs | Architectural shingles |
| Clay or concrete tile | Spanish and Mediterranean | Stucco homes, long roof life | Spanish tile roofs |
| Standing seam metal | Sleek and modern | Contemporary builds, coastal durability | Standing seam metal |
| TPO or torch down | Flat and low-profile | Flat roofs, decks, modern boxes | Flat roof systems |
| Synthetic slate or shake | High-end, natural look | Fire-zone homes and custom builds | DaVinci Roofscapes |
Every roof is different, so we never quote from a photo. These are the things that move the price up or down.
Your written estimate lists each of these, so you can compare quotes line by line. Questions about who does the work? Get to know our crew.

A new roof is not just about looks. In the City of Los Angeles, a re-roof has to pass a few rules before the permit can be closed.
Planning solar panels? Replacing the roof first saves the cost of moving panels later. Learn more about re-roofing around solar.
Pick a material, choose a trusted brand and see the nearby areas where we install new roofs.
Have more questions? Read our roofing tips and guides, learn about our team or send us a message.
What to expect before, during and after a new roof.
Most homes take two to five working days once the permit is ready. Tile roofs, steep roofs and homes needing a lot of wood repair can take longer. Weather can also change the schedule.
Sometimes the code allows it, but we usually do not recommend it. Tearing off the old roof lets us find rotted wood, add new underlayment and give you a roof that lasts its full life.
No. Most families stay home. It will be noisy during working hours, so pets and people who work from home may want a quiet spot elsewhere for the day.
We cover plants, windows and walkways with tarps, use a roll-off bin for debris and run magnetic sweepers each day to pick up stray nails.
We will measure your roof, explain your material options and give you a written price that includes the permit, tear-off and cleanup.